İyi bir akla sahip olmak yeterli değildir

Slides:



Advertisements
Benzer bir sunumlar
Restaurant Yönetim Sistemi
Advertisements

TAM ZAMANINDA ÜRETİM (JUST IN TIME MANUFACTURING)
İşletmelerde Üretim Faaliyetleri 10 Devam
İTME VE ÇEKME SİSTEMLERİ HAZIRLAYANLAR NİLHAN GÜLLÜ ÖZGE ÖZER
İmalat Planlama ve Kontrol Sistemi (İPKS)
MALZEME İHTİYAÇ PLANLAMASI
KONU: Verimlilik nedir? Verimlilik hesabı nasıl yapılır?
Restaurant Yönetim Sistemi
TERZİ USULÜ VE SİPARİŞ ESASLI İŞ MODELİNDE ÇİZELGELEME İHTİYACI
TEDARİK ZİNCİRİ YÖNETİMİ.
BÖLÜM VI ÜRETİM YÖNETİMİ.
TGSD Başvuru Formu Dikkat Edilecek Hususlar
Bütünleşik Dökümhane Çözümü
HASTANE ÇAĞRI MERKEZİ İYİLEŞTİRME ÇALIŞMASI Yalın 6 Sigma Projesi
7.1 GENEL Kuruluş, güvenli ürünler gerçekleştirmek için ihtiyaç duyulan süreçleri planlamalı ve geliştirmelidir.
yazılımda yenilikçi çözümler
TIBBİ MALZEME YÖNETİMİ
FABRİKA ORGANİZASYONU
YERLEŞTİRME DÜZENİ TİPLERİ
KÜÇÜK İŞLETMELERDE ÜRETİM İŞLEVİ VE YENİ ÜRETİM SİSTEMLERİ
TPM (Toplam Verimli Bakım)
3. Üretim Sistemi Geliştirme Planı ve Üretim Planının Hazırlanması
İşletme Yönetimine Giriş Arş. Grv. Gültekin ALTUNTAŞ
Endüstri Mühendisliğinde Karar Alanları ve Proses Tasarımı
İşletmelerde Üretim Faaliyetleri 10
MUHASEBENİN UZMANLIK ALANLARI
Kalite Yönetim Prensipleri (Devam)
Bazı terimler Gelir Maliyetler Karlar
8 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Yalın Üretim 8 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Yrd.Doç Dr. YILMAZ GÖKŞEN
 KURULUŞ : TEMMUZ  FAALİYET ALANI: YAZILIM  UZMANLIK ALANI : ÜRETİM SİSTEMLERİ SİPARİŞ BAZLI SİSTEMLER MALİYET SİSTEMLERİ PROSES BAZLI SİSTEMLER.
İşletmelerde Bilişim Sistemleri
ÜRETİM YÖNETİMİ PROF. DR. ORHAN TORKUL ARŞ. GÖR. M. RAŞİT CESUR NORMAN GAITHER,GREG FRAZIER, OPERATIONS MANAGEMENT Slides prepared by John Loucks  2002.
PROF. DR. ORHAN TORKUL ARŞ. GÖR. M. RAŞİT CESUR
İşletmeye Giriş Konu 10: İşletmelerde Üretim Faaliyetleri
Tedarik Zinciri Yönetimi
KALİTE YÖNETİM SİSTEMİ
STOK YÖNETİMİ Mba Operasyon yönetimi
YALIN SİSTEMLER. YALIN SİSTEMLER - YALIN SİSTEM YAKLAŞIMINI KULLANARAK SÜREKLİ İYİLEŞTİRME - YALIN SİSTEMLERDE TEDARİK ZİNCİRİ KONULARI - YALIN SİSTEMLERDE.
Stok Yönetimi Planlı Sonradan Siparişli EOQ veya
MRP (Malzeme İhtiyaç Planlama)
ÜRETİM VE OPERASYON YÖNETİMİ 2009 Prof.Dr. Şakir ESNAF İ.Ü.MÜHENDİSLİK FAKÜLTESİ ENDÜSTRİ MÜHENDİSLİĞİ BÖLÜMÜ AVCILAR İSTANBUL.
ÜRETİM VE ÜRETİM YÖNETİMİ Öğr. Gör. Kadir GÜNGÖR
Manufacturing Planning and Control – İmalat/Üretim Planlama ve Kontrol
İŞLETMELERDE VERİMLİLİK: ÜRETİM YÖNETİMİ FONKSİYONU
Stok Politikasına Göre Üretim Sistemleri
FABRİKA VE PROSES TASARIMI
KURUMSAL KAYNAK PLANLAMA Kurumsal Kaynak Planlama (ERP) sisteminin gelişimi:
Daha çok değil, daha akıllı çalışmak
Üretim Yönetimi 1.Bölüm.
Tedarik ziNCİRLERİ yÖNETİmi
TEDARİK ZİNCİRİ YÖNETİMİ Tedarik Zinciri – Temel Kavramlar
Kurumsal Varlık Yönetimi Sistemi
ÜRETİM Girdilerin fayda yaratacak şekilde mamul veya hizmete dönüştürülmesi faaliyetidir.
TEDARİK ZİNCİRİ YÖNETİMİ.
YALIN UYGULAMALARI 2020 Stratejik Planı Mart 2017.
KİTAP: PROF.DR. BÜLENT KOBU
ÜRETİM ÖĞR.GÖR.TAYLAN VURGUN.
ÜNİTE 2: ÜRETİM YÖNETİMİ.
MALZEME MALİYETLERİ Prof.Dr. A. Vecdi CAN.
Kalite Yönetim Prensipleri (Devam)
Bölüm 2 ÖRGÜTLERDE BİLGİ YÖNETİMİ, KARAR VERME VE BİLİŞİM SİSTEMLERİNDEKİ HİYERARŞİK YAPININ MİMARİSİ Kısım 2.
NİŞANTAŞI ÜNİVERSİTESİ
NİŞANTAŞI ÜNİVERSİTESİ
NİŞANTAŞI ÜNİVERSİTESİ
NİŞANTAŞI ÜNİVERSİTESİ
NİŞANTAŞI ÜNİVERSİTESİ
Yrd.Doç.Dr. Reha KILIÇHAN Erciyes Üniversitesi Turizm Fakültesi 2018
Sunum transkripti:

İyi bir akla sahip olmak yeterli değildir İyi bir akla sahip olmak yeterli değildir. Asıl olan onu iyi kullanmaktır. Descartes Hasan ŞEREFHAN

ÜRETİM KONTROL SİSTEMLERİ ÇEKME SİSTEMLERİ (KANBAN) İTME SİSTEMLERİ (MRP) Üretim kontrol sistemleri iki temel grupta sınıflandırılabilir. (Kimura ve Terada 1981)

İTME SİSTEMLERİ (MRP) Geleneksel üretim sistemidir. Malzeme ihtiyaç planlaması olarak da adlandırılabilir.

Üretim sistemlerinde parçalar üretilir ve bir sonraki sürece veya stok alanına gönderilir. Bu sistemde üretim kontrol kısmı, çizelge üzerinde gerçekleşen ve planlanan üretim miktarlarını kontrol eder, sapmaları ortaya çıkarır. Geleneksel üretim sistemidir. Malzeme ihtiyaç planlaması olarak da adlandırılabilir.

Tahminlere dayanan bir sistemdir Tahminlere dayanan bir sistemdir. Gelecekteki talep için yapılan tahminlerden ve müşteri siparişlerinden yola çıkarak genellikle haftalık bazda hazırlanan üretim programına , ürün ağaçlarında yer alan bileşenlere göre iş emirleri ve satınalma emirleri üretilir. Materials Requirement Planning, is it a Push system or a pull system? When ever I go for MRP implementation, most often I come across this question. What is the real difference between Push system and pull system? How do we implement JIT, Kanban and other planning systems along with MRP? Can they co-exist? These are typical questions asked during implementation. It is very important, before the MRP implementation these are understood for implementing "an effective implementation process, not just an efficient process". Efficiency is doing the things right and Effectiveness is doing the right things. In simple terms, Push system is based on Customer Orders (Demand) and the forecast. Based on the demand, both material and capacity planning is done. Shop floor control is based on the demand and orders. Here both the material flow and the information flow are in the same direction. This is generally suitable for Make to stock situation. MRP is a Push system. A Pull system on the contrast is based on Made to Order situation. The material is flow is in the reverse direction of document flow. The shop flow control is based on the actual requirements and is close to Just in Time. Pull systems utilize the real demand (Customer Orders received), where as the Push systems are based on the Forecast and build for expected Orders. So which system is suitable for a given organization? In general the manufacturing units combine both Made to Order and also made to stock situations. There will be forecast errors and there will be Demand variations. Which system is more effective?

ÇEKME SİSTEMLERİ (KANBAN) Materials Requirement Planning, is it a Push system or a pull system? When ever I go for MRP implementation, most often I come across this question. What is the real difference between Push system and pull system? How do we implement JIT, Kanban and other planning systems along with MRP? Can they co-exist? These are typical questions asked during implementation. It is very important, before the MRP implementation these are understood for implementing "an effective implementation process, not just an efficient process". Efficiency is doing the things right and Effectiveness is doing the right things. In simple terms, Push system is based on Customer Orders (Demand) and the forecast. Based on the demand, both material and capacity planning is done. Shop floor control is based on the demand and orders. Here both the material flow and the information flow are in the same direction. This is generally suitable for Make to stock situation. MRP is a Push system. A Pull system on the contrast is based on Made to Order situation. The material is flow is in the reverse direction of document flow. The shop flow control is based on the actual requirements and is close to Just in Time. Pull systems utilize the real demand (Customer Orders received), where as the Push systems are based on the Forecast and build for expected Orders. So which system is suitable for a given organization? In general the manufacturing units combine both Made to Order and also made to stock situations. There will be forecast errors and there will be Demand variations. Which system is more effective?

Sonraki süreçlerin önceki süreçlerden, sadece tükettikleri miktarda ve zamanda parça talep ettikleri ve çektikleri sistemlerdir. Tam Zamanında Üretim Sistemi de bir çekme sistemi olarak tanımlanabilir. Monden,1983 ; Rao,1989; Yokato,1991

Çekme sistemleri, analizleri ve iyileştirme araçlarını uygulamada kolaylık sağlayan ve sisteme kararlılık sağlayan yöntemdir Çekme sistemlerinin öncelikli hedefi Tedarik Sürelerini kısaltmak ve Proseste kararlılık sağlamaktır. Sadece en az stok, dengeli üretim hızı ile sağlanacak olan beklemeleri ortadan kaldırmak bu planda önemlidir. Beklemeler verimlilik anlamında son derece önemlidir.

GENEL ÇEKME SİSTEMİ (Generic Pull System) YERİNİ DOLDURMA ÇEKME SİSTEMİ (Replenishment Pull System)

İTME SİSTEMİ ÇEKME SİSTEMİ Geleneksel üretim sistemidir. Malzeme ihtiyaç planlaması olarak da adlandırılabilir.

İŞLETME VERİMLİLİĞİ HAMMADDE PROSES PAKETLEME DEPOLAMA

İŞLETME VERİMLİLİĞİ PROSES GİRDİ ÇIKTI HAMMADDE PROSES PAKETLEME DEPOLAMA

VERİMLİLİK Üretim sürecine sokulan çeşitli faktörlerle (girdiler) bu sürecin sonunda elde edilen ürünler (çıktılar) arasındaki ilişkiyi ifade eder ve üretilen mal ve hizmet miktarı ile bu mal ve hizmet miktarının üretilmesinde kullanılan girdiler arasındaki oran olarak tanımlanır. Çıktı / Girdi olarak formüle edilir.

Teknolojinin hızla gelişip dünyaya yayıldığı bir dönemde , müşteri ihtiyaçları doğrultusunda ürünlerin tasarımlarıda sürekli değişmektedir. Bu değişiklikler imalatı kolaylaştırıcı, maliyeti düşürücü, üretim akışını hızlandırıcı nitelikte ise verimlilik artar.

HAT ETKİNLİĞİ & HAT PERFORMANSI 24 SAAT Üretim Süreci TOPLAM SÜRE BOŞ SÜRE (Dinlenme) TOPLAM ÜRETİM ZAMANI DURUŞLAR NET ÜRETİM ZAMANI HEDEF ZAMAN KAYIP ZAMAN HEDEF ZAMAN + KAYIP ZAMAN NET ÜRETİM ZAMANI + DURUŞLAR = NET ÜRETİM ZAMANI TOPLAM ÜRETİM ZAMANI

Üretim hattında problem Hat duruşlarının açıklaması Üretim hattında problem Var mı? YES Downtime Üretim hattında Çalışma ekibi var mı? NO Hat Üretim için uygun mu? Efficiency Loss Idle Time

DYO BOYA FABRİKALARI 6 SIGMA PROJELERİNDE ÇEKME SİSTEMİ UYGULAMALARI

KÜÇÜK BATCH ÜRETİM KAPASİTE ARTIŞI Müşteri Taleplerini hızlı karşılamak ve mevcut koşullarda en düşük stok ile çalışılabilecek bir üretim yönetim sistemi oluşturmak ; Üretim hızını artıracak iyileştirme alanları oluşturacak sistemler geliştirmek ;

Küçük Batch Üretim Kapasite Artışı projesinde; üretimlerin zamanında gerçekleşebilmesi için ne kadar üretimin ne zaman üretileceği bilgisinin sağlanması amaçlanmıştır. Çekme kanban ve Üretim kanban kullanılmaktadır.

GENEL ÇEKME SİSTEMİ Üretim hattımızda hammaddelerin bulunduğu girdi stok alanı ve ürünlerin bulunduğu çıktı stok alanı bulunmaktadır. Girdi stok alanları ürünlerde kullanılan hammaddelerin kullanıldığı alanlardır. Çıktı stok alanları ise üretilen ürünlerin depolandığı alanlar olarak üretim hattımızda bulunmaktadır.

PROJE İÇİN YAPTIKLARIMIZ 5 S UYGULAMASI Girdi stok alanlarında bulunan hammaddeler için 5S uygulanmıştır. Küçük batch üretim hattı için raf düzeni kurulmuştur.

ÖNCE

SONRA

ÖNCE SONRA

Takip Sisteminin Kurulması Planlama Bölümü ile oluşturulan sistemde Küçük batch üretim siparişlerinin günlük olarak sisteme girilmesi sağlanmıştır, Ürün için gerekli hammaddeler mal kabul bölümü tarafından hazırlanarak Girdi stok alanındaki raflara kodlama yapılarak yerleştirilir.

Takip Sisteminin Kurulması Hammadde stok alanlarındaki raflar numaralandırılmıştır. Takip sistemine girilen sipariş ürünler için gerekli hammaddeler “Hammadde İstek Formu” ile talep edilir, Raf no’ları form üzerinde belirtilir.

Takip Sisteminin Kurulması Pazartesi Seri Renk Miktar (kg) Durum Açıklama 276 4853 1500 OK

Ürünlerin Pazar ve Müşteri istekleri doğrultusunda ve miktarlarda üretilerek üretim hattımızdaki çıktı stok alanına gönderilir. Üretim tamamlandıktan sonra Takip sistemi çizelgesi işlenerek bir sonraki üretim için hammadde hazırlığı başlar. Üretim hücreleri arasında hareket ile bilgi akışı sağlanır.

Sonuç olarak; müşteri taleplerine göre oluşan üretimlerin tam zamanında üretilmesi için gerekli hammaddelerin tam zamanında istenilen noktaya temin edilmesi gerçekleştirilmiştir. Ara stoksuz, verimli, günlük ve küçük partiler halinde üretimlerin gerçekleşmesi sağlanmıştır,

Müşteri siparişleri için üretmek Üretim Takip Sistemi FONKSİYONLAR KATEGORİLER GENEL ÇEKME Çıktı Hızı Ürün Seçimi Süreçler & Seviyeleri Üretilen Ürünler Müşteri siparişleri için üretmek Üretim Takip Sistemi Malzemeler Hammadde Hammadde İstek Kartı Kapasite Üretim Hattı Geri Besleme Aksamalar ve Duruşlar Kontrol Listeleri Grafik ile anlatım..

GENEL ÇEKME SİSTEMİ Proje aşamasında genel çekme sistemi uygulaması sonrasında PTS azalmış ve Yarı Mamül stokları sınırlandırılmıştır. Sipariş karşılama hızı artmıştır, Hammadde temin sürelerinde iyileştirme sağlanmıştır.

Grafik ile anlatım..

Two-Sample T-Test and CI: PROSESCEVRIMSURE(SN); durum Two-sample T for PROSESCEVRIMSURE(SN) durum N Mean StDev Önce 25 15194 10717 Sonra 25 8123 3079 Difference = mu (Önce) - mu (Sonra) Estimate for difference: 7072 95% CI for difference: (2496; 11648) T-Test of difference = 0 (vs not =): T-Value = 3,17 P-Value = 0,004 DF = 27

DEVAM EDEN PROJELER “FOR CUSTOMERS, JUST IN TIME” PLANLAMA SÜRECİNİN İYİLEŞTİRİLMESİ REPLENISHMENT PULL SYSTEM

REFERANSLAR Web Sayfaları; İtme ve Çekme Sistemleri, mpm.org.tr/verimlilik mmo.org.tr/endüstrimuhendisliği Kaynaklar ; Infinitas