YERLİ RÜZGAR TÜRBİNLERDE GÜÇ ELEKTRONİĞİ VE KONTROLÜ(MİLRES) Görkem Ziya Yanık Elektrik Mühendisi İstanbul Ulaşım Aş TEG 15 09.03.15
Contents Application structure Concept of rotational speed- and power control FAT Tests
Application Structure
Application Structure Generator Operate Pitch Safety Chain Grid Weather Power Curve Etc. Hydraulic Yaw Blade Controller
Operation Diagrams
Operational States
Wind Blade Pos. ≠ setpoint? (R) Speed or Inv. Speed ! Blade Position (Encoder) Blade Motor Speed Setpoint Generator Blade Controller Measured Pitch Angle Pitch Angle Setpoint (G) Speed Pitch (G) Speed ≠ setpoint? (G) Speed setpoint Pitch position- and speed limits ! Operate
500kW FAT Test
Topology of the Turbine Test System 500kW Converter Commissioning
LAB. Test Results Conv. Dc link Emergency Stop at 100 kW Drive Speed Power Ref & Tracking