HAS 222 Risk Assessment.

Slides:



Advertisements
Benzer bir sunumlar
Atama ve eşleme (eşleştirme) problemleri (Matching and Assignment problems)
Advertisements

Logical Design Farid Rajabli.
UNIT 2 HIDDEN HAZARDS In your home. HIDDEN HAZARDS IN YOUR HOME Hide (v): place out of sight, conceal, gizle, sakla Hidden (v3) Hazard (n) = danger (tehlike)
Bu proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir. Building Mutual Trust Between the Labour Market and Education Panel Session.
21. Yüzyılda Tıpta Kök Hücrenin Yeri. “ I magination is more Important than knowledge ” Albert Eistein.
NOUN CLAUSES (İSİM CÜMLECİKLERİ).
/ 141 Yrd. Doç. Dr. Turan SET Atatürk University Medical Faculty, Erzurum QUALİTY CIRCLES
EXPRESSING AGREEMENT AND DISAGREEMENT
Nobody’s Unpredictable Urban Age Istanbul Survey – the views of residents Ben Page, Chief Executive, Ipsos MORI
BM-305 Mikrodenetleyiciler Güz 2015 (6. Sunu) (Yrd. Doç. Dr. Deniz Dal)
Database for APED Büşra Bilgili | Emirhan Aydoğan | Meryem Şentürk | M. Arda Aydın COMPE 341.
INFORMED CONSENT Assist.Prof.Dr. Mehmet KARATAS Dept. of History of Medicine & Ethics.
S ÜLEYMAN Ş AH ÜN İ VERS İ TES İ DERS KAYIT İŞ LEMLER İ / COURSE REGISTRATION PROCESS.
21/02/2016 A Place In My Heart Nana Mouskouri « Istanbul « (A Different Adaptation)
İş analizi, iş tanımları ve iş profilleri. İlk iş analizi çalışmaları: Taylor (1911), Elton Mayo ( ) İlk sistematik çalışmalar: the Department.
© 2016 Future simple (will) © 2016 ingilizcebankasi.com.
Determination of uncertainties in energy and exergy analysis of a power plant Prof. Dr. H. Mehmet Şahin Gazi Üniversitesi Enerji Sistemleri Mühendisliği.
Dinamik Yapay Sinir Ağı Modelleri Yinelemeli Ağlar (recurrent networks) İleri yolGeri besleme.
SIK kullanılan CÜMLELER
What is lost in translation?
AVRUPA BİRLİĞİ GUNDTVİG ÖĞRENME ORTAKLIĞI ‘ALTIN ÇOCUKLAR ALTIN EBEVEYNLER’ PROJESİ EUROPEAN UNION GRUNDTVIG LEARN PARTNERSHIP GOLDEN PARENTS FOR GOLDEN.
LITERARY TRANSLATION 2 Week 5. In-class translation workshop.
Practice your writing skills
First Conditional Sentences. LOOK AT THE EXAMPLES If the weather is fine, we’ll play tenis If I have enough money, I’ll buy the car If it rains, we’ll.
Aesthetic Dermatology Seperatly from the nature of skin, the skin needs also vary with age. Resistance of skin to external environment decreas, skin starts.
DISCUSSION
CHILD PORNOGRAPHY IŞIK ÜNİVERSİTESİ
FLEXIBILITY AND JOB CREATION POLICIES BARIŞ KILIÇ.
Students social life and join the social clubs. BARIŞ KILIÇ - EGE DÖVENCİ IŞIK ÜNİVERSİTESİ
Risk Assessment: A Practical Guide to Assessing Operational Risk Chapter 2: Risk Assessment Standards and Definitions.
Risk Assessment: A Practical Guide to Assessing Operational Risk Chapter 1: Risk Assessments: Their Significance and the Role of the Safety Professional.
THE SIMPLE PRESENT Tense
Self-Registration on the Coats Supplier Portal
Computerized ways to analyze language data
CHAPTER 1 uzm. Psk. Özlem ataoğlu
SHOULD EXPLANATION   *Should öğüt ya da tavsiye bildirmektedir. Bir kişiye öğütte bulunurken kullanılmaktadır. Yapılmasının iyi olmayacağını söyleyebilmek.
Femore Cream femore medikal jel nedir government shutdown on GE's businesses, Rice remained bullish on GE's renewed focus on core infrastructure areas.
Geriatrist gözüyle yoğun bakım
BİLİMSEL ÇALIŞMA BASAMAKLARI SCIENTIFIC WORKING STEPS MHD BASHAR ALREFAEI Y
HAS 222 Risk Değerlendirmesi.
TURKISH 1 (UHF1271) İŞARET ZAMİRLERİ DEMONSTRATIVE PRONOUNS
FINLAND EDUCATION SYSTEM I am talking about the Finnish education system today.
SHOULD EXPLANATION   *Should öğüt ya da tavsiye bildirmektedir. Bir kişiye öğütte bulunurken kullanılmaktadır. Yapılmasının iyi olmayacağını söyleyebilmek.
DÜZLEM MEKANİZMALARIN
Future: I will/shall & I am going to. Structure: Subject+will/shall+verb(base form)+object.
tomorrow soon next week / year in five minutes/ in two hours later today I'll go to the market tomorrow. Don’t worry. He will be here soon. There.
MAKİNA TEORİSİ II STATİK KUVVET ANALİZİ Prof.Dr. Fatih M. Botsalı.
NİŞANTAŞI ÜNİVERSİTESİ
MAKİNA TEORİSİ II GİRİŞ Prof.Dr. Fatih M. Botsalı.
Turkish cuisine is very popular around the world. It has a very wide options for everyone. The variety of the recipes and the ingredients which are grown.
NİŞANTAŞI ÜNİVERSİTESİ
“Differentiation for making a positive Difference!!!!”
BİLL GATES Şule Eslem ÖZTÜRK NUN OKULLARI Prep-A.
NİŞANTAŞI ÜNİVERSİTESİ
Multipoint programlama
NİŞANTAŞI ÜNİVERSİTESİ
NİŞANTAŞI ÜNİVERSİTESİ
NİŞANTAŞI ÜNİVERSİTESİ
Before the Battle of Çanakkale. Why a Front in Çanakkale was Opened? In the summer of 1914, the war continued in Europe with all its intensity, and by.
Feminism, unlike the idea of ​​ mankind, is a trend that is prioritized to bring gender inequality to the agenda. The notion of feminism, which is not.
Chapter 4 - The effect of profit or loss on capital and double entry system for expenses and revenues Bölüm 4 – Kâr ve zararın sermaye üzerindeki etkisi.
Imagine that you are a teacher and you are taking your 20 students to England for the summer school.
DÜZLEMSEL MEKANİZMALARIN
ELİF SU KÜÇÜKKAVRUK. plants When you touch this plant, it can be like the photograph. When you let go, it becomes normal.
SUBJECT NAME Prepeared by Write the names of group members here
People with an entrepreneurial mindset are always brave.
Sunum transkripti:

HAS 222 Risk Assessment

Why is it important? Human Economical Legal

Risk analysis Less dangerous (must be renewed after 6 year) Very dangerous (must be renewed after 2 year)

Risk analysis Hazard: Potential to cause harm Risk: The likelihood of that the harm from a particular hazard is realized

What is Risk? Risk = L x S L: Likelyhood of occurence S: Impact severity of occurence RISK: Risk is avaluated as the product of likelihood of occurence and impact severity of occurence of the event. LIKELIHOOD RİSK IMPACT

Risk Terminology Risk assessment process starts with the question; “What can go wrong?” Risk assessment consist of; Hazard identification Event probability assessment Consequence assessment

Hazard Identification Physical hazards: Noise Vibration High or low pressure Radiation Heat or cold Sharp objects, etc. Chemical hazars: All chemicals Biological hazards: Microorganisms Electrical hazard

Risk Analysis Methods 100’s of methods Qualitative Quantitative Combined

Risk Analysis Methods Check- List Matrix Fine Kinney Primary method Matrix The most widespread method. Fine Kinney Modified matrix method including three parameters probability, frequency and severity of consequence. Hazard and Operability Studies (HAZOP) Have been used extensively in the chemical industries to examine what impact deviations can have on a process. Failure More and Effect Analysis (FMEA) Used to determine where failures can occur within hardware and process systems and to assess the impact of such failures. Fault Tree Analysis (FTA), Event Tree Analysis (ETA) and Cause/Consequence Analysis (CCA) Systematic, logical developments of many contributing factors to one unwanted event.

Checklist Aims to check whether the equipments are complete and the system is working properly Consist of questions to be answered as Yes or No Should also include the preventive measures

Ministry of Labor and Social Security General Directorate of Occupational Health and Safety Examples of Risk Analysis Guidelines   "Taksi ile Yolcu Taşımacılığında Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. "Çağrı Merkezlerinde Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. “Diş Klinik ve Muayenehanelerinde Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. "Kasaplarda Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. "Kuru Temizlemecilerde Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. "Mutfak Lokanta Pastanelerde Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. "Ofislerde Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. "Apartmanlarda Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. "Kuaförlerde Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. "Genel Yolcu Taşımacılığı Risk Değerlendirmesi Rehberi" için TIKLAYINIZ. "Özel Güvenlik Faaliyetleri Risk Değerlendirmesi Rehberi" için TIKLAYINIZ.

Checklist for Dental Clinics Konu Başlığı Kontrol Listesi Evet Hayır Alınması Gereken Önlem Sorumlu Kişi Tamamlanacağı Tarih GENEL Zemin kayma veya düşmeyi önleyecek şekilde uygun malzeme ile kaplanmış ve iç ve dış zeminler (salon girişi, merdivenler vs.)düzenli olarak kontrol ediliyor mu?   Zeminde çökme, erime vb. deformasyonlar var mı? Aynalar da dâhil cam yüzeyler (cam aksamlı mobilyalar, kapı, pencere vb.) uygun şekilde monte edilmiş, yüzeyler üzerinde kırık ve çatlak gibi hatalar bulunuyor mu? Merdiven genişlikleri ve basamak yükseklikleri uygun mu? Merdivenler boyunca tırabzanlar mevcut mu? Tırabzan ayakları arasında uygun aralıklarla dikmeler veya düşmeyi önleyecek kapalı bloklar mevcut mu? Temizlik yapılan alanda kaymayı önlemek için gerekli önlemler alınıyor mu? Bütün alanlar iyi aydınlatılmış, pencere alanı yeterince büyük ve doğal aydınlatmadan yeterince faydalanılıyor mu? ÇSGB, İSG Gn.Md.

Matrix Method This method forms the basis for other methods. This is a combined risk analysis method. Usually applied as 3×3 ya da 5×5 matrixes. A risk matrix is used to define the level of risk by considering the category of probability or likelihood against the category of consequence severity. For each of the hazard, assign a rating to its likelihood and severity. Then locate it in the appropriate position in your risk assessment matrix. Preventive measures are recommended. 

Probability Score Probability Description 1 Rare This will probably never happen 2 Unlikely Do not expect it to happen but it is possible 3 Possible Might happen occasionally 4 Likely Will probably happen 5 Very Likely Will undoubtedly happen

Consequence Severity Score Severity Description 1 Insignificant Not likely to cause injury or ill-health 2 Minor Injury or ill-health requiring first-aid only (includes minor cuts and bruises, irritation, ill-health with temporary discomfort). 3 Moderate Injury requiring medical treatment or ill-health leading to disability 4 Major Serious injuries or life-threatening occupational disease 5 Extreme Fatality, fatal diseases or multiple major injuries.

Risk Matrix (5×5)

Risk Matrix (5×5)

Risk Control After risk analysis appropriate measures should be taken to reduce high risk into an acceptable level. General Control Engineering control (physical change) Work practice control (way of doing a job) Personal Control Personal protective equipment

General Control Measures Risk elimination (if possible) Replacement with the safe one –or less hazardous Insulation Ventilation (general/local) Local lightening Machine guarding Warning signs Administrative measures

Personal Control Measures Job suited person selection, training, inspection Initial health control Periodical health control Personal protective equipment