Sunuyu indir
Sunum yükleniyor. Lütfen bekleyiniz
YayınlayanUnay Poyraz Değiştirilmiş 9 yıl önce
1
YERLİ RÜZGAR TÜRBİNLERDE GÜÇ ELEKTRONİĞİ VE KONTROLÜ(MİLRES)
Görkem Ziya Yanık Elektrik Mühendisi İstanbul Ulaşım Aş TEG 15
2
Contents Application structure
Concept of rotational speed- and power control FAT Tests
3
Application Structure
4
Application Structure
Generator Operate Pitch Safety Chain Grid Weather Power Curve Etc. Hydraulic Yaw Blade Controller
5
Operation Diagrams
6
Operational States
7
Wind Blade Pos. ≠ setpoint? (R) Speed or Inv. Speed ! Blade Position (Encoder) Blade Motor Speed Setpoint Generator Blade Controller Measured Pitch Angle Pitch Angle Setpoint (G) Speed Pitch (G) Speed ≠ setpoint? (G) Speed setpoint Pitch position- and speed limits ! Operate
8
500kW FAT Test
9
Topology of the Turbine Test System
500kW Converter Commissioning
10
LAB. Test Results Conv. Dc link Emergency Stop at 100 kW Drive Speed Power Ref & Tracking
11
Thank you for your attention.
İstanbul Ulaşım AŞ Esenler Ferhatpaşa Metro Tesisleri İstanbul/Türkiye
Benzer bir sunumlar
© 2024 SlidePlayer.biz.tr Inc.
All rights reserved.